Operator file
Available for work
Sole operator

HERO

Software and field engineering · East Tennessee

zedTECH TN LLC
TEL  419-617-5226
MAIL  zty@zed-tech.net
HEIGHT  6′ 4″
WEIGHT  200 lb
HAIR  Brown
EYES  Blue

Projects on record17
Mean capability index84
REPAIR86FABRICATION74AUTOMATION82SOFTWARE79DIAGNOSIS88VERIFICATION91ESTIMATING80FOLLOW-THROUGH90

Scores are a self-assessment and should be read as one. The evidence beneath each is not: every line names work that exists and can be checked.

01

Capture

A lightweight approximate operator model. Drag with a mouse or finger to rotate it; scroll or pinch to use the controlled zoom.

Operator modelApproximate digital model — drag to rotate
02

Disciplines

Eight capabilities across four areas. Four of them involve no computer at all.

Field work

The half of the business that arrives with tools

REPAIR86

The handyman side of zedTECH: drywall, doors, fixtures, decks, assembly, hauling and clear-outs. 135 job requests came through the account in its first five weeks.

FABRICATION74

Carpentry and welded steel, and a 30-page build plan carrying a dimensioned drawing at every step with two routes through it.

Software

The half that runs once everyone has gone home

AUTOMATION82

A quoting bot that reads real job requests, prices them and replies — running unattended, behind 178 automated tests.

SOFTWARE79

Six languages in regular use. Desktop applications, browser games written with no engine underneath, and command-line tooling.

Diagnosis

Establishing what is actually wrong before anything is touched

DIAGNOSIS88

A whole-PC diagnostic built around suppressing false alarms rather than maximising test count, and a field-operations audit that found the tools were already paid for and switched off.

VERIFICATION91

Inspecting the binary a build produced instead of trusting its exit code, and mutation-testing suites to find the tests that cannot fail.

Client work

The part that determines whether I am hired a second time

ESTIMATING80

Real jobs priced off a rate card and quoted back the same day, with the number holding unless the scope moves.

FOLLOW-THROUGH90

One person from the quote to the last screw. No subcontracting, no handoff, and nobody else to explain the job to.

03

Equipment

What is in use on both sides of the business.

ON THE VAN
Welder · saws · router · drills · hand tools · ladders · truck and trailer
TRADES
Carpentry · steel · drywall · fixtures · assembly · hauling and site clearance
LANGUAGES
Python · PowerShell · JavaScript · GDScript · C++ · C#
PLATFORMS
Windows internals · WMI/CIM · Win32 · web · Godot 4
AUTOMATION
Make · Zapier · n8n · CRM and calendar APIs · webhooks
INSTRUMENTS
Profilers · test harnesses · mutation testing · DNS and mail tooling
04

Operating principles

How the work is conducted, stated so it can be held against me.

Principle 01

Existing tools are checked first

Before anything is proposed, I establish whether the capability is already present and unused in software you are paying for. On my own field business, that was the finding.

Principle 02

A passing test is a claim, not a result

Build output is inspected against the source that produced it. I have shipped a build that compiled cleanly, reported success, and silently contained none of the changes.

Principle 03

Both halves, one contractor

The person who scopes the work performs it. There is no subcontracting, no handover, and no second party to brief.

Principle 04

An honest negative is a deliverable

If there is nothing worth automating, that is the finding, and the report is delivered and charged for on the same terms as any other.

Principle 05

The assumptions are stated

Where a recommendation rests on something I could not verify, the limitation is named in the document rather than omitted from it.

05

Work record

6 active, 11 delivered, drawn from the same record as the projects index so the two cannot disagree.

ActiveAutomatic quoting botAutomation & operations
ActiveThe diagnostic engineAutomation & operations
ActiveSoftware opportunity researchResearch & analysis
ActiveVehicle simulator extensionGames & simulation
ActiveTraining and supplement stackPersonal systems
ActiveFive-year savings modelPersonal systems
DeliveredPC DoctorSoftware & tools
DeliveredBest ProductSoftware & tools
DeliveredVideo MakerSoftware & tools
DeliveredField operations auditAutomation & operations
DeliveredWhere unmet need actually isResearch & analysis
DeliveredAI video tooling reviewResearch & analysis
DeliveredBrand rebuildDesign & fabrication
DeliveredEngineered build plansDesign & fabrication
DeliveredFurniture and woodworkDesign & fabrication
DeliveredMultiplayer mod audit and patched buildGames & simulation
DeliveredBrowser gamesGames & simulation

Engage zedTECH

Both halves of the business reach the same number.

Call or text 419-617-5226zty@zed-tech.net
Call 419-617-5226Email